From Petition to Policy: A Mini-Case Study on Winning One Concrete City Change in 90 Days

From Petition to Policy: A Mini-Case Study on Winning One Concrete City Change in 90 Days

How a small group of neighbors got a protected crosswalk installed near an elementary school, and the exact playbook you can reuse for your block.

The quick version (TL;DR)

  • Problem: Cars were speeding past an unmarked crossing used by kids and seniors.

  • Goal: Install a high-visibility, ADA-compliant crosswalk with signage by Day 90.

  • Levers: Transportation department (TD) work order + small capital line in the city’s traffic-calming program.

  • Result: Crosswalk installed on Day 83; follow-up speed survey showed average speeds down 7% and yielding up 23%.


Why this works

Small, specific fixes (crosswalks, bus shelters, curb ramps, shade trees) live inside existing city programs. That means you don’t need to pass a law, you need to surface data, show support, and trigger an administrative decision tied to clear standards.


The 90-day playbook (steal this)

Weeks 1–2: Define the ask and collect receipts

  • Pick one location + one intervention. (e.g., “Install a high-visibility crosswalk across Maple Ave at 3rd.”)

  • Gather evidence:

    • 10–15 geo-tagged photos/video at school arrival/dismissal and evening rush.

    • A quick neighbor survey (Google Form) capturing “how often you cross here,” “near misses,” and zip code.

    • Crash/safety context: prior police or 311 reports if you have them.

  • Draft a one-pager: problem, proposed fix, why it qualifies (school zone, senior center, bus stop), and a polite 150-word memo to the Transportation Department (TD).

Weeks 3–4: Build visible, local support

  • Petition: 150–300 signatures from immediate blocks + school community. Include a checkbox for “I can attend a meeting.”

  • Stakeholder calls: principal, crossing guard captain, ADA advisory council member, nearby small businesses.

  • Two quotes: one from a parent/caregiver, one from a senior or mobility-impaired neighbor.

Weeks 5–6: File the request and put it on a public agenda

  • Submit to TD via the official traffic-calming or “quick build” request portal (or email if no portal).

  • Ask for an item on the next Traffic & Parking Commission/Committee (TPC) agenda (or equivalent).

  • Confirm standards: cite the city’s crosswalk warrant policy or Vision Zero plan language if available.

Weeks 7–8: Do the hearing well

  • Prep speakers: 3–5 neighbors with 60–90 seconds each; no more.

  • Bring a one-page handout: map, photos, petition count, and the exact language you want adopted (“Direct TD to install…”).

  • Leave with a verb: aim for a motion directing TD to evaluate and, if it meets standards, install by a set date—or to bring back an implementation plan.

Weeks 9–10: Follow the paper and remove excuses

  • Inside baseball: ask the staffer which work order number will track the installation; note any procurement or weather holds.

  • Problem-solve fast: if the delay is paint availability, offer an alternate approved marking; if it’s a utility conflict, ask staff to adjust the placement 5–10 feet.

Weeks 11–12: Lock the date and show up

  • Confirm install week in writing.

  • Safety day: a small volunteer crew does “slow down” outreach with the school/center the morning after installation.

  • Document impact: repeat 15-minute yield counts and basic speed observations at the same times as baseline.


The artifacts (copy/paste)

1) Petition text (150 words)

We, the residents, parents, and neighbors near Maple Ave & 3rd, ask the City to install a high-visibility, ADA-compliant crosswalk with advance “Yield to Pedestrians” signage. This crossing serves [School/Center], a bus stop, and many seniors. Photo/video evidence (attached) shows frequent close calls and driver failure to yield. The City’s [Traffic Calming / Vision Zero] policy prioritizes school-area safety. We request staff evaluate per adopted standards and, if warranted, install by [DATE] as a Quick-Build measure. Sign to support; check the box if you can attend the hearing.

2) Email to Transportation Department (intro + attachments)

Subject: Request for high-visibility crosswalk at Maple & 3rd (School Zone)

Hello [Staffer Name],
On behalf of neighbors and [School], we’re requesting a high-visibility crosswalk at Maple & 3rd. Attached: a one-pager, 40 photos, a 2-minute compilation video, and 243 petition signatures. This meets [policy/standard] as a marked school-area crossing. Could you share the evaluation timeline and the work order number once created? We’re also requesting a Traffic & Parking agenda slot in [Month].
Thanks so much,
[Name], [Phone], [Address]

3) 60–90 second hearing script (pick one speaker per bullet)

  • Open with clarity (15s): “We’re asking for a high-visibility crosswalk at Maple & 3rd by [DATE].”

  • Evidence (30s): “Here are AM and PM videos showing kids stepping into traffic; yielding is under 50%.”

  • Policy match (20s): “Your adopted school-zone standard and Vision Zero plan prioritize this exact fix.”

  • Community voice (20s): “You have 243 local signatures; PTAs and [Senior Center] support.”

  • Close (10s): “Please move to direct staff to evaluate and, if warranted, install by [DATE], and report back if anything blocks the timeline.”

4) One-pager outline (front of handout)

  • Header: “Install a High-Visibility Crosswalk at Maple & 3rd by [DATE]”

  • Map + photo strip (AM/PM)

  • Why now: school zone, bus stop, prior 311s (bullets)

  • What we’re asking: crosswalk type, signs, curb paint; “Quick-Build eligible”

  • Support: petition count + logos (PTA, Senior Center, Business Assoc.)

  • Contact: lead organizer + TD staff email for updates


Measuring the win

  • Before/after yield rate: 20 random crossings each period; count driver behavior.

  • Average speed at free-flow: quick radar or “two-point timing” with a phone and a friend.

  • Near-miss log: ask the school/center to track for 30 days.

  • Satisfaction pulse: 3-question survey to the same list you used for the petition.


Common pitfalls (and fixes)

  • “Come back next year.” Ask which standard is unmet. If it’s volume, propose a pilot marking during school hours.

  • “No budget.” Ask to classify as maintenance or a quick-build (paint/posts) while capital is queued.

  • “We need a study.” Request a 30-day evaluation with a report-back date; offer volunteer counts to speed it up.

  • Diffuse asks. Keep it to one location, one treatment. Win it, then replicate.


Template timeline you can drop into your city

  • Day 1: Name the location + fix.

  • Day 7: Evidence packet complete.

  • Day 14: Petition hits 150; TD request submitted.

  • Day 28: TPC agenda confirmation.

  • Day 42: Hearing + motion adopted.

  • Day 60: Work order issued; install week penciled.

  • Day 83: Installation.

  • Day 90: Publish results; thank staff publicly; queue next site.


Make it public (so it scales)

  • Post the one-pager and evidence folder.

  • Share the work order number and install week—neighbors love following along.

  • After installation, publish your before/after counts and credit the city team by name.


Closing

Policy changes don’t always require a march. Sometimes they’re a memo, a motion, and a few mornings of patient counting. Pick one corner. Get organized. Win once. Then show your neighbors how to copy it. And if you want a low-key conversation starter at your next count shift, our “No Bans, Just Books” tote sits nicely on the table while you collect signatures.

0 comments

Leave a comment

Please note, comments need to be approved before they are published.